Filip Slavtchev

Best practice: Culvert for medium-voltage power grid in Biskupice Radłowskie, Poland

Summary

Crossing under the Dunajec River as part of the conversion of a 15 kV medium-voltage grid with a crossing length of 420 m using DRILL 28N by JAMAT, PL.

About

 

Filip Slavtchev combines geological expertise with profound sales experience and management skills, holding an M. Sc in Drilling and Geoengineering. He works as Area Sales manager for TRACTO Poland where he is in charge of developing the markets for trenchless technologies with a focus on directional drilling in Eastern Poland.

Recording

Request now

We will make a recording available shortly after the lecture program. Register now if you would like to watch our program after the event.